Requirements

Our client, a leading global underwater pump systems manufacturer had an urgent requirement for an additional storage facility at their secure research and development site as their existing facilities were at maximum capacity.

Solution

The modular building supplied by RÖDER HTS HÖCKER was an extremely cost effective solution met the client’s needs perfectly and was installed with minimal disruption to their day to day business.

The 10.00m x 20.00m temporary warehouse facility was installed to the clients existing ground surface with our unique safe anchoring system. The building was supplied with 70mm (1-hour fire rated) insulated wall panels, thermo inflatable roofs, external gutters, 1 x manual roller shutter door, 3 x personnel fire doors and internal and external lighting.

The whole process from date of order through to final handover took only five weeks. The client was extremely satisfied with the modular building especially the speed of turnaround from initial contact through to final delivery. So much so, they recommended RÖDER HTS HÖCKER to other divisions within their group as their chosen supplier for future temporary structure requirements.

Enquire about this product