Requirements

RÖDER HTS HÖCKER client MDM was appointed by Porsche UK to source and manage the new Carrera Cup Race Centre. The building attends all 10 rounds of the Carrera Cup GB on an annual basis and caters for between 600-800 guests over the course of a weekend. The Race Centre is the hub of the championship and is where all race weekend information is held as well as catering for the teams, drivers, sponsors and guests.

Solution

Working closely with MDM, RÖDER HTS HÖCKER developed a unique temporary hospitality centre sized at 15.00m x 20.00m with an eave height of 4.80m. The building incorporated a curved roof fitted with our themo inflatable roof system. The building was installed on an integrated cassette floor system with cassette boards specially fitted with a grey, non-slip vinyl finish. Special features of the building included 10.00m portal beams which created 10.00m clear internal side access to restaurant and merchandising facility trailers which were positioned to both sides of the building. The building also featured a “barrel” curved gable end framework which created a unique entrance to the building.

Enquire about this product