Requirements

Our client a global electronics and electrical engineering company required a temporary warehouse structure for a fixed rental period of 18 months during the construction phase of a new wind turbine assembly and storage facility in Belfast.

Solution

HTS tentiQ Solution:
The client needed a temporary warehouse tent structure within a matter of 3 weeks. To facilitate this urgent request, HTS tentiQ re-deployed a temporary warehouse building that had just returned from a long-term rental that fitted their exact size requirements. After a short factory inspection and cleaning of the covers, the temporary structure was dispatched and installed within a matter 21 days from the date of order.

The customer was extremely satisfied with the overall final solution provided, the speed of response combined with minimal site disruption to their busy site operations.

Enquire about this product